Send an Inquiry

Home / Development

From your list or sample to first article — about one month.

A reference that is not in range yet is a development job. Huaihai develops new brake rotors, brake drums and steering knuckles from a physical sample or OE data, entirely inside its own plant and laboratory.

01Two Ways In

Start from a sample, or from data.

Route A

From your sample

Send a new, genuine sample part. We measure and scan it, section a second sample for materials analysis where needed, and build our own production drawings from the results — your sample stays the reference until the first article is approved against it.

Route B

From your reference list

Send the OE numbers you buy, with rough annual volumes. We confirm coverage line by line; for references not yet in range we work from OE data and catalogue dimensions, and flag any number where a physical sample is needed before we commit.

02The Five Steps

One plant, one laboratory, five steps.

STEP 01

Measure

3D scanning and full dimensional mapping of the sample or the OE data — every dimension that decides fitment, recorded before anything is drawn.

STEP 02

Analyse

Spectral materials analysis in our own laboratory establishes the material grade — grey iron, high-carbon, cast aluminium or forged steel — instead of guessing it from the application.

STEP 03

Draw

Our own production drawings with tolerances, a material specification and an inspection plan. The drawing is ours, so the part can be reproduced batch after batch — not copied from a single measured sample.

STEP 04

Validate

Bench validation of the first parts before release — fitment alone is not a release criterion.

STEP 05

Approve

First-article approval with you. Only after your sign-off does the reference move into mass production and into your program.

The full cycle — measurement to approved first article — takes about one month per reference. Development runs reference by reference, so your highest-volume numbers go first.

Send the references you buy most.

We reply with coverage, timing and pricing — item by item, highest volume first.

Start a Development List